Question 1.
A systems analyst would perform all of the following tasks except:

 
End of Question 1


Question 2.
The focus of the first phase of the systems development life cycle is to:

 
End of Question 2


Question 3.
Which of the following would NOT be considered project documentation?

 
End of Question 3


Question 4.
Which of the following best illustrates use of the waterfall model in system development?

 
End of Question 4


Question 5.
A design tool used to trace the flow of data through an information system is called a(n):

 
End of Question 5


Question 6.
A ____________ tool can be used to help automate project documentation in a complex system.

 
End of Question 6


Question 7.
Which of the following is a common problem with using off-the-shelf software as the basis for an organization’s information system?

 
End of Question 7


Question 8.
If a project is abandoned because it requires equipment or software that has not yet been developed, it is said to not be ____________ feasible.

 
End of Question 8


Question 9.
A value-added reseller is best described as:

 
End of Question 9


Question 10.
What type of conversion process installs the next component of a new system only after the previously installed component has proved successful?

 
End of Question 10


Question 11.
Which of the following is NOT found in a post-implementation system review?

 
End of Question 11


Question 12.
When should documentation of an information system be undertaken?

 
End of Question 12


Question 13.
Which of the following is NOT a phase of the SDLC?

 
End of Question 13


Question 14.
If a company wishes to track completion times of various phases of a project, it might make use of a(n):

 
End of Question 14


Question 15.
What type of system conversion has the potential for causing the most serious disturbance in the normal work flow?

 
End of Question 15


Question 16.
A feasibility study is typically undertaken in the design phase of the SDLC.

   
 
End of Question 16


Question 17.
A systems analyst typically is a person highly skilled in computer programming.

   
 
End of Question 17


Question 18.
Acceptance testing is used to ensure that end users are satisfied with a new information system.

   
 
End of Question 18


Question 19.
A parallel conversion runs both the old and new information systems simultaneously to ensure the new system is working correctly, using the old system as a backup if problems occur.

   
 
End of Question 19


Question 20.
In the implement phase of the SDLC, the most important outcome is the delivery of the actual system, whether developed in-house or purchased outside the company.

   
 
End of Question 20


Question 21.
Match each phase of the SDLC with its purpose:



A matching question presents 5 answer choices and 5 items. The answer choices are lettered A through E. The items are numbered 21.1 through 21.5. Screen readers will read the answer choices first. Then each item will be presented along with a select menu for choosing an answer choice. Using the pull-down menus, match each item in the left column to the corresponding item in the right column.
A Examine and document the existing system
B Identify problems and opportunities
C Support the new system
D Decide what the new system should do
E Create the new system
 
 
 
 
 
End of Question 21





Pearson Copyright © 1995 - 2010 Pearson Education . All rights reserved. Pearson Prentice Hall is an imprint of Pearson .
Legal Notice | Privacy Policy | Permissions

Return to the Top of this Page